SLAM DBH
IHP (JV between Vinci and SRM) with systems supplied by Kawneer and Aluprof
JPJ where chosen as sub contractor on this project and predominantly use the Kawneer range of products. The Kawneer curtain wall range can be used in multiple applications but one the installer struggled with was the slopped curtain wall, as this needed to be 60/60 FR. Kawneer could not achieve this with anything outside of a vertical option, hence the Aluprof product being used.
The project was completed on time. JPJ's original contracted works started in December 2021, with an original 8 months contract on site. Due to some areas not being ready but mostly down to variation works, this was extended to March 2023.